Worley Cord measures a major pipe-welding output increase

Original publisher:

Novarc Technologies
Evidence type: Equipment-vendor customer case
Original report: Read the source

What prompted the change

Pipe fabrication depended on difficult-to-scale manual welding capacity and the ability to deliver projects with predictable acceptance and schedules.

What was done

The company adopted specialized robotic spool-welding technology for eligible production work and compared its output with its previous process.

What the source reports

Novarc reports a 230% increase in pipe-welding productivity in the customer application.

What the result does and doesn't establish

The headline result depends on pipe type, thickness, material, fit-up, procedures and actual accepted output. It is not a result RISEC has delivered.

This is an attributed third-party example. RISEC did not deliver the project described in this case, and the reported results are not a promise for another installation.

How to apply this to your own operation

Compare your actual starting conditions, production requirements, operating hours and cost structure with those described in the source. When the conditions differ, the expected economics may differ materially as well. The most useful next step is identifying which measurements would make your own business case credible.

Compare the mechanism with your own process.

Use the published conditions to identify the measurements and operating constraints your project would need to establish.